---
title: "How to Actually Fill Out an AS9102: Forms 1, 2, and 3"
description: "How to complete AS9102 Forms 1, 2, and 3 for Rev C FAIRs"
url: "https://gndctl.com/insights-library/how-to-fill-out-as9102-forms"
author: "GroundControl Editorial Team"
published: "2026-07-31"
updated: "2026-08-25"
insights_url: "https://gndctl.com/resources/how-to-fill-out-as9102-forms"
category: "FAI"
tags: ["AS9102","FAIR","FAI","Form 1","Form 2","Form 3","First Article Inspection","aerospace quality"]
---

# How to Actually Fill Out an AS9102: Forms 1, 2, and 3



> Full Markdown index: https://gndctl.com/llms.txt

> Human-readable version: https://gndctl.com/resources/how-to-fill-out-as9102-forms



## Key takeaways

- Form 1 identifies the part and the FAIR. Form 2 proves materials and special processes. Form 3 proves every characteristic.
- Balloon the drawing before you touch Form 3. Balloon numbers become characteristic numbers: one balloon, one row.
- Rev C (published July 2023) renamed several Form 1 fields, removed the Form 2 signature, and added a Requirement field to capture embedded software.
- Rev C also requires that the person reviewing the FAIR is not the same person approving it.
- The most common failure is inconsistency across the three forms: mismatched part numbers, revisions, or FAIR identifiers.

An AS9102 First Article Inspection Report is three linked forms: Form 1 accounts for the part, Form 2 accounts for its materials and processes, and Form 3 accounts for every drawing characteristic. Most rejections happen because the three forms disagree with each other, not because any single field was wrong. See [Top Five Reasons for an FAI Rejection](https://gndctl.com/resources/top-five-reasons-for-an-fai-rejection) for the patterns reviewers catch most often.

## What are AS9102 Forms 1, 2, and 3?

- **Form 1 (Part Number Accountability):** Which part, which revision, why an FAI was triggered, and who signed off

- **Form 2 (Product Accountability – Materials, Special Processes, and Functional Testing):** That every material, special process, and functional test meets spec, with certs to back it

- **Form 3 (Characteristic Accountability, Verification and Compatibility Evaluation):** That every ballooned drawing characteristic was measured and passed

## How do you fill out Form 1?

This form is used to identify the product that is having the First Article Inspection (FAI) conducted on (for example, a detail part, sub-assembly, or assembly), referred to as the FAI part.

![AS9102C Form 1 Part Number Accountability template with numbered fields](https://gndctl.com/images/insights/as9102-form-1.png)

*AS9102C Form 1: Part Number Accountability*

- **Part number, part name, and drawing revision**: copy these exactly from the [title block](https://gndctl.com/resources/title-block-what-to-look-for-before-you-start-ballooning), including the revision letter.

- **FAIR Identifier**: your unique ID for this report. Use the same string on all three forms and on every piece of objective evidence.

- **Reason for Full / Partial FAI**: under Rev C this is required on every FAIR, not just partials. Be specific: "first production run," "design change to Rev D," "two-year lapse in production," "change of manufacturing location."

- **Part Type and BOM detail**: for an assembly FAIR, list all BOM parts and reference each sub-component's own FAIR.

- **Nonconformance declaration**: state plainly whether the FAIR contains a documented nonconformance.

- **Reviewed by / Approved by**: Rev C expects these to be two different people. Ensure your workflow actually enforces it.

## How do you fill out Form 2?

This form is used if any materials, special processes, or functional testing are defined as a design characteristic.

For every material, special process, and functional test called out on the drawing or in the spec tree, record one row: the material or process name, the specification number and revision, the supplier and their approval code, and the certificate number that backs it.

**Three things reviewers check first:**

- **Spec revisions match the drawing.** A cert to AMS 2700 Rev E against a drawing calling Rev F is a finding.

- **Special process suppliers are customer-approved.** Nadcap accreditation alone is not the same as your customer's approved-source list.

- **Every row has a traceable cert number.** "On file" is not a cert number.

![AS9102C Form 2 Product Accountability template for materials, special processes, and functional testing](https://gndctl.com/images/insights/as9102-form-2.png)

*AS9102C Form 2: Product Accountability*

## How do you fill out Form 3?

This form is used to record inspection results for the design characteristics and to document any applicable nonconformances (reference section 4.5).

- **Balloon the drawing first.** Every dimension, tolerance, note, [GD&T](https://gndctl.com/resources/understanding-gd-t-a-practical-guide-for-aerospace-quality-teams) feature control frame, and flag note gets a unique balloon.

- **One balloon = one characteristic number = one row.**

- **Reference Location**: record the drawing zone or sheet so a reviewer can find the requirement in seconds.

- **Characteristic Designator**: flag key and critical characteristics here. Missing a flagged characteristic is a hard rejection.

- **Requirement**: transcribe the nominal and tolerance exactly as drawn, including basic dimensions and units.

- **Results**: record actual measured values, not "OK" or "pass." Variable data where variable data exists.

- **Designed Tooling and Nonconformance Number**: populate where applicable rather than leaving them blank without reason.

Then reconcile: your highest characteristic number should equal your balloon count. If they differ, something was missed.

![AS9102C Form 3 Characteristic Accountability template with characteristic and results columns](https://gndctl.com/images/insights/as9102-form-3.png)

*AS9102C Form 3: Characteristic Accountability*

## FAQ

### Do I need a separate FAIR for each serial number?

No. An FAI covers a representative part from the first production run. You need a new or delta FAIR when a design, process, tooling, or location change affects fit, form, or function, or after a lapse in production if your customer specifies one.

### What's the difference between a full, partial, and delta FAI?

A full FAI verifies every characteristic. A partial FAI verifies only the characteristics affected by a specific change. A delta FAI is the common industry term for a partial that references the original FAIR. Under Rev C you must state your reason either way.

### Can I write "pass" in the Form 3 Results column?

Not for anything measurable. Attribute results are acceptable for pass/fail requirements, but variable characteristics need actual values. "Pass" against a ±0.005 tolerance is one of the most common rejection causes.

## Ready to simplify your AS9102 workflow?

GroundControl automates ballooning, Form 1–3 assembly, and tolerance validation so your team produces audit-ready FAIRs faster, with fewer rejections. Explore [First Article Inspection software](https://gndctl.com/solutions/first-article-inspection-software) or [book a demo](https://gndctl.com/#demo) to see how it fits your workflow.

---

Full site index: https://gndctl.com/llms.txt
