From First Article to PPAP.

The PPAP starts from the first article you already inspected. Process flow, PFMEA, Control Plan, MSA, and capability read its balloons and results, then export into the customer’s PPAP workbook.

48610.000 ±0.0501Form 3Process flowPFMEAControl PlanMSA · Gage R&RCapabilityWorkbook

Follow one balloon.

Balloon 1 is the bore. Every characteristic stays linked across every task in the campaign.

Form 3

Balloon is detected and read off the drawing

The drawing is ballooned for the first article: requirement, tolerance, designator, sub-balloons, and zone. Every page after this reads from that row.

AS9102 Form 3 · Characteristic accountabilityBRK-4471
Char.ZoneRequirementToleranceDesignator
1A1Bore diameter 10.000±0.050Key
2A1Overall length 80.00±0.050Major
3A1Edge break 0.40±0.050Minor
4A1Mounting hole position 25.00±0.050Major

Process flow

Op 50 bores it

Start from the routing you already run. Process steps can carry over from earlier reports, even for a different part. Op 50, Bore the datum hole, is tied to balloons 1 and 8.

Process flow · steps carried from an earlier reportBRK-4471
  1. OP 30
    Face the datum
  2. OP 40
    Drill the mounting holes
  3. OP 50
    Bore the datum hole
    18
  4. OP 60
    Mill the pocket
  5. OP 70
    Deburr

PFMEA

Two failure modes suggested for op 50

One comes from the last PPAP on this part, the other from the drawing. Nothing is added to the PFMEA until you tick it.

Suggest failure modes · op 50 Bore the datum holeBRK-4471
1Linked characteristicFrom the last PPAP

Bore comes out oversize

8Linked characteristicFrom the drawing

True position drifts

Add selected (2)

Control Plan

Six of nine Control Plan fields arrive filled

Category, specification, limits, and technique come from Form 3. Gage resolution comes from the MSA, and the controlling step from the process flow. Frequencies can carry over from the last PPAP. Notes are yours.

Control PlanBRK-4471
1Bore diameter
Category
KeyForm 3
Specification
10.000 ±0.050Form 3
Spec limits
9.95 – 10.05 mmForm 3
Measurement technique
Bore gageForm 3
Gage resolution
0.001MSA
Controlling process step
op 50Process flow
Frequency before approval
100%Last PPAP
Frequency after approval
1 per hourLast PPAP
Notes
—Yours to set

Also on this plan: balloons 2 to 8.

MSA

A Gage R&R on the same balloon

The bore gage study is set up on balloon 1: two appraisers, ten parts, three trials each. Readings paste in from Excel.

MSA · ANOVA Gage R&R · balloon 1, Bore diameterBRK-4471
Gage
Bore gage · BG-14
Gage resolution
0.001
Appraisers
Alex, Blair
Parts × trials
10 × 3
60 of 60 readingsResolution goes to the Control Plan

Capability

Capability from the CMM files you import

Import a sample of CMM files in one batch. The study reads the results from Form 3, so nothing is copied through a spreadsheet.

Capability · balloon 1, Bore diameterBRK-4471
30 readings across 3 lotsNormal distribution · study saved
LSL 9.95USL 10.05
n
30
Mean
10.0003
Ppk
1.23

Workbook

Export writes into the customer’s workbook

Rows land on the customer’s PPAP workbook template, with the bubbled drawing alongside. The Form 2 certs go in, and the control charts and histograms the template expects are rebuilt. Renumber a balloon and every row that points at it updates. Ask us whether your customer’s workbook is supported.

Customer PPAP workbook.xlsxBRK-4471
Control Plan!C1710.000 ±0.050
A
C
D
E
17
1
10.000 ±0.050
50
Bore gage
18
2
80.00 ±0.050
20
Caliper
19
3
0.40 ±0.050
70
Edge break gage
CoverDocumentsPFDPFMEAControl PlanMSACap Study

The package follows the published frameworks: first articles under AS9102C, production approval under AS9145 and the AIAG PPAP manual, gage studies under the AIAG MSA manual, and capability as described in the NIST engineering statistics handbook.

See the modern way of completing a correct PPAP.

PPAP questions

PPAP software assembles the production part approval process (PPAP) package: process flow, PFMEA, Control Plan, MSA, capability studies, and the evidence the customer asked for. GroundControl builds that package on the first article and exports it into the customer's PPAP workbook.
An FAI, recorded on AS9102 Forms 1 to 3, verifies that the part matches the drawing. A PPAP, described for aerospace in AS9145 and for the automotive elements in the AIAG PPAP manual, shows that the process making the part is defined, controlled, and capable. In GroundControl the PPAP reads the balloons and results from the FAIR, so the two packages share one source.
Quality engineers at aerospace, defense, and advanced-manufacturing suppliers who already build FAIRs in GroundControl and now owe a customer a PPAP on the same part. Incoming packages from your own suppliers belong in supplier quality management.
Process flow, PFMEA, Control Plan, MSA (Gage R&R), capability, the certs attached to Form 2, and the traveler, work instructions, and process photos stored on the report. Export rebuilds the control charts and histograms the customer's workbook expects. Which of these a customer wants depends on the submission level they ask for.
No. Suggested failure modes, carried-over process steps, and a prefill from an earlier PPAP all wait for you to accept them.
GroundControl prepares the package and the workbook. Approval stays with your customer.
PPAP is an add-on. Existing customers turn it on after a call with the team about their parts and customer workbooks. Book a demo and bring a part of your own.