Quality insights for manufacturing teams

Practical guides on FAI, GD&T, CMMC, metrology, and the workflows that keep aerospace and defense suppliers shipping on time.

GD&T

Why Every Feature on a Drawing Needs a Tolerance

This article explains what the rule requires, how a feature gets its tolerance, and why complete tolerancing matters when a part goes through first article inspection (FAI) under AS9102.

Read article
GD&T

CAD Model vs. Drawing: Which Basic Dimension Should Your CMM Program Use?

When CAD nominals and boxed basic dimensions disagree, your CMM program and FAIR depend on which document governs—and how you record the decision.

Read article
Inspection Strategy

How to Balloon an MBD Model for First Article Inspection

This guide walks through three ways to balloon a model-based definition, what to confirm with your customer before you start, and how to account for the requirements that never appear as an annotation at all.

Read article
GD&T

How to Read a Feature Control Frame

A feature control frame is read left to right. Here's what each compartment means, from the geometric symbol to the datum references, per ASME Y14.5-2018.

Read article
Supplier Quality

Rising A&D Volume, Limited Skilled Labor: Where Automation Actually Helps

A&D manufacturing is seeing a historic surge and OEMs are ordering more than ever, but paperwork limits how fast shops can accept more work.

Read article
Supplier Quality

How to Ace Your Customer Scorecard

Improve your customer scorecard rating: get the rubric in writing, align on delivery clocks, prevent FAI documentation rejections, and close SCARs on time.

Read article
PO Review

Introduction to aerospace ordering: quotes, purchase orders, and what a review looks like

PO vs quote checklist for aerospace and defense suppliers: what to compare on a customer purchase order before production, including revision, flow-downs, FAI, DPAS, and invoice matching.

Read article
FAI Best Practices

Software That Automates Ballooning of Drawings for FAI Submissions: A 2026 Buyer's Guide

How to evaluate automated ballooning software for AS9102 FAIRs, what extraction methods actually mean, and what to test before you buy.

Read article
Press Release

GroundControl Government-Cloud Security Update

An update on the security assessment and deployment options available to regulated manufacturing customers.

Read article
FAI

How to Actually Fill Out an AS9102: Forms 1, 2, and 3

How to complete AS9102 Forms 1, 2, and 3 for Rev C FAIRs

Read article
FAI

What Is an FAI? FAI vs. FAIR Explained

FAI and FAIR aren’t the same thing. Here’s the difference between First Article Inspection (the process) and the FAIR (the AS9102 report).

Read article
FAI Best Practices

Title Block Red Flags: What to Look For Before You Start Ballooning

A pre-ballooning title block checklist for AS9102 FAIRs, drawing revisions, referenced documents, approvals, and aerospace quality teams.

Read article
Inspection Strategy

MBD Rollout Checklist for Suppliers: A Practical Implementation Guide

A step-by-step checklist for aerospace and defense suppliers adopting model-based definition workflows, with guidance on PMI readiness, CMM traceability, FAIR reporting, and phased deployment.

Read article
Inspection Strategy

Model-Based Definition (MBD) Inspection vs 2D Ballooning: What Quality Teams Need to Know

A practical guide to how MBD inspection differs from traditional 2D drawing workflows, where CMM traceability improves FAIR quality, and what to look for in 3D PMI-driven inspection software.

Read article
Supplier Quality

Supply Chain Inspection and Visibility for Aerospace Suppliers

How aerospace manufacturers and suppliers can improve supply chain visibility, monitor inspection compliance globally, and flag out-of-tolerance results faster.

Read article
CMMC

CMMC 2.0 Starter Guide

A practical CMMC 2.0 overview for aerospace and defense suppliers, including levels, timeline, and readiness steps.

Read article
FAI

Top 4 ITAR-compliant AS9102 First Article Inspection (FAI) Software (2026)

A practical guide to ITAR-friendly AS9102 tools, how to evaluate them, and which options are best for different aerospace teams.

Read article
OCR

A Guide to OCR on PDF Drawings

Why extracting dimensional data for AS9102s is hard, and what aerospace quality teams should expect from OCR.

Read article
AS9100D

AS9100D Starter Guide for Quality Managers

What AS9100D is, why it matters, and how to plan an implementation or transition from ISO 9001.

Read article
Metrology

Choosing a CMM in 2026

A practical guide to selecting between bridge and portable CMMs, and matching capability to inspection needs.

Read article
FAI

How Manufacturers Can Eliminate FAI Errors, With or Without a CMM

A practical workflow for error-free AS9102 reports using CMMs or manual tools.

Read article
FAI

Migrating FAI Data to a New Software

How to move AS9102 FAIR data without losing history, traceability, or momentum.

Read article
FAI

Top Five Reasons for an FAI Rejection

The most common causes of AS9102 FAIR rejection and how to prevent them.

Read article
CMMC

U.S. MFG pursuing CMMC should choose FedRAMP-Certified Cloud over On-Premises

CMMC is mandatory for defense suppliers. Here is why FedRAMP cloud reduces compliance burden.

Read article
GD&T

Understanding GD&T: A Practical Guide for Aerospace Quality Teams

A clear, inspection-focused guide to GD&T concepts, feature control frames, and common aerospace characteristics.

Read article